Just seeing if I'm the slow one, or if it's normal.
How long does it take you to setup and tear down, and with what equipment?
For me, a T stand with lights, fog machine prep, amp case, mixer/cd/mic case, 2 15" tripod speakers, and the decorating of a tabletop facade/table skirt, and wire management, along with a sound check and adjustment.
Setup is about 45-60 minutes.
Teardown is about 30-45 minutes.
This is with just me, a one person job.
How long do you take?
How long does it take you to setup and tear down, and with what equipment?
For me, a T stand with lights, fog machine prep, amp case, mixer/cd/mic case, 2 15" tripod speakers, and the decorating of a tabletop facade/table skirt, and wire management, along with a sound check and adjustment.
Setup is about 45-60 minutes.
Teardown is about 30-45 minutes.
This is with just me, a one person job.
How long do you take?